Reconstruction of the GZ Media production building, Loděnice
Construction period: | 11/2011 – 04/2012 |
---|---|
Investor: | GZ DIGITAL MEDIA a.s. |
Scope of Work: | Repair of plaster 6,500 m2 Gypsum board ceilings 2,100 m2 New painting and paint repairs 4,200 m2 |
Following a large fire, the main production building of GZ Digital Media in Loděnice u Berouna was completely reconstructed within a short period of 5 months. Among other, the clean-up works included the repair of the damaged roof cladding, including the delivery and installation of 4 pre-stressed reinforced concrete support beams with a length of 30 m, the installation of new façade cladding, repair of the interior premises, reconstruction of existing and delivery of new MEP installations, the repair and modernisation of the cargo elevator and elevator machine room.