Construction of a new storage and administrative hall, Králův Dvůr
Construction period: | 07/2024-06/2025 |
---|---|
Volume-area: | 2.723 m2 usable area |
Scope of Work: | General delivery |

The new building is divided into two parts, a three-story administrative part, which is northwest oriented with a total usable area of 467 m2, and a single-storey storage part, which will be used for the storage and shipment of goods and is divided into 3 separate warehouses. The hall includes two tilting hydraulic bridges at the recessed supply bays. The total usable area of both parts is 2,723 m2. Part of the work was the main paved area made of cement concrete and the access roads for the fire brigade made of grass paving. As part of the general delivery of a new building, our company also provided MEP installation, including working and workshop design.