Tha construction has benn completed and handed over to the investor.

Construction of the production facility with an administrative building in Uherský Brod is located in the grounds of Slovanské hutě and will serve as a manufactory and storage hall for the air conditioning filters. The total built-up area of the hall is 4.780m2. The construction is based on deep foundations – reinforced concrete bored piles with footings placed on their heads. The load bearing structure consists of precast reinforced concrete frame, completed with steel structures in the facade cladding,  internal partition walls and roof. Roof is of a flat type and facade cladding is of lightweight pleated metal meeting with thermal insulation of mineral fibers. Loading and unloading ramps, entrance door and gate to the hall are located on the east side of the building. Hall is on its the north side connected by a covered bridge with two-storey, 630m2 of a total built area office building, which is being part of the industrial park. Restrooms for production workers and catering facilities will be located on the 1st floor, 2nd floor is intended for offices, meeting and training room. Architectural design of the administrative building is simple and corresponds with the purpose of the building. The load bearing structure is designed of being monolithic reinforced concrete system.  The building is covered by a flat, single skin type of roof.

Compound of the production facility features the entrance gate, internal roads and pavements with 7.800 m2 of parking area, consisting of 80 parking places and separate building, separate building of sprinkler system machinery  room with its own sprinklers tank and waste storage for handling of packaging.