Newly constructed COMPLEX OF Dymo Logistics Park s.r.o., Nymburk

The newly constructed warehouse hall with a total usable area of 4,037 m2 will be used for long-term leasing for the storage of raw materials, finished products, and packaging. The hall is a single-story building divided into several storage areas. It also includes a three-story mezzanine structure (Section A) and a two-story mezzanine structure (Section B). Access to the second floor of mezzanine A is provided by a prefabricated reinforced concrete two-flight staircase with an intermediate landing. Within the hall, fire-resistant partition walls constructed from 100 mm mineral-core panels are planned. These walls are either supported by a steel structural framework or anchored directly to the prefabricated structural columns of the building. The hall also includes employee welfare facilities and office spaces. The building is constructed using a prefabricated reinforced concrete structural system, supported by foundations on drilled concrete piles. The hall will be clad with horizontal sandwich panels with a mineral wool and IPN core, and will be covered by a flat roof bordered by a parapet.The hall will be naturally ventilated by roof skylights controlled by electric drives. The hall's storage areas will be heated by under-ceiling hot water circulation units. The heat source for heating the hall and the mezzanine structures will be air-to-water heat pumps.
The facility will be connected via newly constructed utility connections. The site layout includes paved internal circulation routes and designated parking areas.
The construction is scheduled for completion in August 2026.